Preferred Schematic Report – Elizabeth G. Lyons Elementary School
As required by the Massachusetts School Building Authority (MSBA), the Randolph School Building Committee and the Project Team (OPM and Architect) have created a Preferred Schematic Report (PSR) for submission to the MSBA for review, comment, and approval.
The Preferred Schematic Report includes updates to the Educational Program for the school building, final evaluation of the existing conditions, final evaluation of all alternatives, and the Town’s and School District’s preferred option/solution for addressing the needs of the School and School District.
The Architect (TSKP Studios) and OPM (Daedalus) have collaborated with the Randolph School Building Committee to study and document the Preferred Schematic Report attached. Included in the report are the following sections:
Preferred Schematic Report
↑ Click link above to view the document
1. Introduction
1.1 Introduction
1.2 Process Overview and Updated Project Schedule
1.3 Existing Conditions: Final Evaluation
1.4 Alternatives: Final Evaluation
1.5 Randolph’s Preferred Solution
1.6 MSBA Preliminary Design Program Review and Responses
2. Evaluation of Existing Conditions
2.1 Updated Existing Conditions Narratives and Graphics
3. Final Evaluation of Alternatives
3.1 Introduction
3.2 Site Analysis
3.3 Evaluation of Construction Impact
3.4 Conceptual Building Plans and Site Plan
3.5 Building Systems Narratives
Geotechnical Narrative
Utility Narrative
Permitting Narrative
Architectural Narrative
Structural Systems
MEP and Fire Protection
Technology
3.6 Construction Cost Estimate: Options 1, 2, 3, 4, 5
3.7 Cost Summary
3.8 Project Design and Construction Schedule
4. Preferred Solution
4.1 Randolph’s Preferred Solution
4.2 Educational Program
4.3 Preferred Solution Space Summary
4.4 Variation of Initial Summary
4.5 Sustainability Documentation
4.6 Building Plans
4.7 Site Plans
4.8 Total Project Budget and Local Funding
4.9 MSBA Budget Statement
4.10 Project Design and Construction Schedule
5. Local Actions and Approvals
5.1 Signed Local Actions and Approval Certification
5.2 School Building Committee Meeting Mins. Index
5.3 List of School Building Committee dates, agendas, materials
6. Appendices
6.1 Preliminary Hazardous Materials Assessment of Devine Building
6.2 Preliminary Geotechnical Investigations at the Devine Site
6.3 Town of Randolph Historical Commission: Determination of Historical Significance for 55 Old Street (Devine School)
6.4 Phase I investigation of Devine Site
6.5 Survey of Devine Site