Existing Conditions Report & Development of Conceptual Options

As part of the MSBA’s “Module 3” the project team documented the conditions of the existing Elizabeth G. Lyons Elementary School building and began presenting conceptual options for renovation, renovation/addition, and new construction. As required by the MSBA, multiple locations were studied including the current site as well as other available locations in Randolph. The School Department and the project team also began a study of enrollment analysis, projections, and redistricting scenarios.